History of AURIGA detector status
13/05/09
update on the AURIGA status
19/05/05
further major improvement after upgrade of the low frequency suspension
22/12/04
improved performance after installation of new suspension stage
29/10/04
detector sensitivity
30/12/03 first announcement of detector status and calibration (
see our Bulletin Board
)
05/12/03 AURIGA reached the operating parameters and began data taking
01/12/03 cooled, start preliminary measurements
25/11/03 start cooling with Liquid Helium
12/11/03 start cooling with Liquid Nitrogen
31/10/03 h13.55 local time - start vacuum pumping
31/10/03 finished
detector assembling for RUN2
Last update 13/05/09
Glossary